Â鶹ԼÅÄ

subscribe

Construction Start: Wong – Mezzanine renovation

Please be advised that Â鶹ԼÅÄ has mandated Corenov Constructeurs to carry out the following project: 22-028 Wong – Mezzanine renovation

Description: Renovations to 3M055 and office 3M030 to create one new lab space.

Construction start date: September 2024

Planned construction end date: February 2025

Published: 11 Sep 2024

Construction start: MNI (Neuro) - CFI JELF room 254 renovation

Please be advised that Â鶹ԼÅÄ has mandated ISI Construction Inc. to carry out the following project: 23-117 MNI (Neuro) - CFI JELF room 254 renovation

Description: Renovation of room 254 (incl. new interior finishes, upgrade of electromechanical services) to accommodate research needs.

Construction start date: September 11, 2024

Planned construction end date: November 15, 2024

Published: 11 Sep 2024

Construction start: Lyman Duff New Wing – Priority building envelope repairs

Please be advised that Â鶹ԼÅÄ has mandated Atwill-Morin Maçonnerie to carry out the following project: 22-033 Lyman Duff New Wing (B169) – Priority building envelope repairs

Description: Repair/replacement of damaged bricks & wall at the back of the building, adjacent to tunnel between MNI and Duff, up to the delivery dock of the Lyman Duff Building.

Construction start date: September 3rd, 2024

Published: 5 Sep 2024

Construction start: Raymond (Macdonald Campus)– JELF Dastmalchi (Lot 1)

Please be advised that Â鶹ԼÅÄ has mandated Corenov Construction to carry out the following project: 21-002 Raymond (Macdonald Campus) – JELF Dastmalchi (Lot 1)

Description: Renovation of room R1-038 and partial renovation of room R1-037.

Construction start date: August 12th, 2024

Planned construction end date: September, 2024

Work schedule: Monday to Friday, 6 a.m. to 3 p.m.

Published: 13 Aug 2024

Construction start: Strathcona Anatomy and Dentistry – Prototype for masonry restoration

Please be advised that Â鶹ԼÅÄ has mandated Atwill-Morin Maçonnerie to carry out the following project: 21-099 Strathcona Anatomy and Dentistry - Prototype for masonry restoration

Description: Phase 2 of the renovation associated to the study aimed at confirming the condition of the masonry walls and identifying a strategy to renovate the building envelope.

Published: 9 Jul 2024

Construction start: Burnside Hall – 10th floor offices

Please be advised that Â鶹ԼÅÄ has mandated Les Entreprises N.R. Brosseau inc. to carry out the following project: 20-201 Burnside Hall – 10th floor offices

Published: 9 Jul 2024

Construction start: Redpath Hall – Rehabilitation of Building Envelope - Lot 1, Repair and waterproofing of foundations, and Lot 2, Slate roof repair.

Please be advised that Â鶹ԼÅÄ has mandated Mongrain Inc. (Lot 1) and Couverture Montréal-Nord (Lot 2) to carry out the following project: 22-019 Redpath Hall – Rehabilitation of Building Envelope - Lot 1, Repair and waterproofing of foundations, and Lot 2, Slate roof repair.

Description: The project consists of the first two lots (Lot 1, Foundation Repair, and Lot 2, Roof Repair) of the Redpath Hall building envelope rehabilitation project.

Published: 27 Jun 2024

Construction start: Redpath Library, McTavish Wing – Rehabilitation of Building Envelope - Lot 1, Repair and waterproofing of foundations, and Lot 2, Slate roof repair

Please be advised that Â鶹ԼÅÄ has mandated Mongrain Inc. (Lot 1) and Couverture Montréal-Nord (Lot 2) to carry out the following project: 22-018 Redpath Library, McTavish Wing – Rehabilitation of Building Envelope - Lot 1, Repair and waterproofing of foundations, and Lot 2, Slate roof repair.

Published: 27 Jun 2024

Construction start: Macdonald-Stewart - Upgrade Fire Suppression System LOT 1A

Please be advised that Â鶹ԼÅÄ has mandated Gicleurs Moderne Inc. to carry out the following project: 24-001 Macdonald Stewart - Upgrade Fire Suppression System LOT 1A (work in 3 laboratories).

Description: Installation of the main sprinkler line in the ceiling of three teaching laboratories located in the basement level of Macdonald-Stewart Building #446.

Construction start date: June 20, 2024

Published: 20 Jun 2024

Construction start: McLennan Library – Convert 25kv distribution switches

Please be advised that Â鶹ԼÅÄ has mandated La Cie Électrique Britton Ltée to carry out the following project: 17-160 McLennan Library – Convert 25kv distribution switches.

Published: 20 Jun 2024

Construction start: Royal Victoria College (RVC) Residence - Masonry work

Please be advised that Â鶹ԼÅÄ has mandated Atwill-Morin Maçonnerie to carry out the following project: 22-036 (RVC Residence - B180) - Restoration of rendering on rear façades

Description: The project involves restoring the rendering on the rear façades of the Royal Victoria College (RVC), a student residence building, located on University Street.

Construction start date: July 2nd, 2024

Published: 17 Jun 2024

Construction start: McCall MacBain Arts – Replacement of fire curtain between Arts and Leacock buildings

Please be advised that Â鶹ԼÅÄ has mandated Corenov Constructeurs Inc. to carry out the following project: 21-058 McCall MacBain Arts – Replacement of fire curtain between Arts and Leacock buildings.

Description: Replacement of fire curtain between McCall MacBain Arts and Leacock buildings.

Construction start date: June 25th, 2024

Planned construction end date: October 2024

Published: 17 Jun 2024

Construction start: Arena McConnell Upgrade - Lot 2

Please be advised that Â鶹ԼÅÄ has mandated DEVCOR to carry out the following project: 18-156 McConnell Arena upgrade – Lot 2

The project consists of upgrading the electrical infrastructure to enable the replacement of the ice-making system, which will allow the arena to remain open for a longer portion of the year. The project also includes the modernization of sections of the ventilation and cooling systems.

Published: 17 Jun 2024

Construction Start: Replacement of steam and condensate pipes between Raymond and CINE, Macdonald Campus

Please be advised that Â鶹ԼÅÄ has mandated MécanicAction to carry out the following project: 21-050 Replacement of steam and condensate pipes between Raymond and CINE, Macdonald Campus

Description:

Replacement of steam and condensate pipes between Raymond and CINE

Construction start date: June 12th, 2024

Planned construction end date: August 2024

Published: 17 Jun 2024

Construction Start: McCall MacBain Arts - Masonry work

Please be advised that Â鶹ԼÅÄ has mandated Rainville et Frères to carry out the following project: 19-163 McCall MacBain Arts – Masonry work.

Final phase of the masonry restoration on two facades of the west side of the McCall MacBain Arts Building.

Construction start date: June 17th, 2024

Planned construction end date: September 17th, 2024

Work schedule: Monday to Friday, 6 a.m. to 3 p.m.

Published: 7 Jun 2024

Pages

Back to top